Fire precautions in the design, construction and use of buildings - Managing fire safety Ingestion-build-51215 Structure of verification
$174.00
Description
Structure of verification
5 Test method
folding trestles and lightweight stagings
The results of these stages shall be shown individually (without being added together)
Annex A (informative) Example Information Security Event and Incident Report Forms
Fire precautions in the design, construction and use of buildings - Managing fire safety Ingestion-build-51215 Structure of verificationFire precautions in the design, construction and use of buildings Part 12: Managing fire safety Executive summary Recommendations for the management of fire safety over the lifetime of a building. Abstract This part of BS 5588 gives recommendations for the management of fire safety over the lifetime of a building, including guidance for designers to ensure that the overall design of a building assists and enhances the management of fire safety. It
Shipping Notes
- Free Standard Shipping on $100+ Orders to the USA.
- Except Preorder products are shipped in 48 hours.
- Delivery to the USA:
- Standard Shipping : 3-10 business days
- If time is of the essence, please consider selecting expedited delivery for faster service.
You may also like
US$ 30.00
US$ 121.00
US$ 207.00
US$ 42.95